Chances are you will need to wire up a 75 KVA, delta-wye transformer skid in order to provide temporary power to the construction site. When
Author: Buddy
In the realm of construction, specifically when employing the cast-in-place method for erecting a building, a methodical sequence of events follows the laying of the
The San Francisco skyline, a tapestry of architectural innovation, is constantly evolving. As new high-rises pierce the fog, ensuring the safety and reliability of their
A GC’s Gantt schedule has important information critical to electrical foremen. Starting with the basics, let’s review the different parts of the schedule. The first
Today I came across a magnetic motor starter that has been discontinued by the manufacturer. It’s a Siemens 14CS32A. The customer still wants to use
Why should electricians be concerned whether equipment they’re installing is labeled or listed? As an electrician in San Francisco my work is frequently inspected by
When it comes to multi-family buildings, whether constructing a new structure or renovating an old one, some units must be made accessible for people with
Because the building that I’m working in was built about 50 years ago, I’m coming across old electrical equipment. As an example, one exhaust fan
Today’s task was to provide power to the hoist. The temporary construction elevator anchored to the side of a building. This hoist had a 5.5kw